Song Dive · Arc 2.5

Things I Treasure — FBD 11 Perfect Dive

黒沢ダイスケ feat. 濱田道子 · FORBIDDEN 11 · SPEED 5.00 · PERFECT DIVE

A frame-by-frame read of 도토리's FORBIDDEN 11 Perfect Dive of 黒沢ダイスケ feat. 濱田道子's Things I Treasure — the L-shaped holds, the curved sail, the twin side walls, the PERFECT DIVE banner and a result card whose four judgement rows sum to 1,121 exactly, every number read off the screen.

Key takeaways

  • ▸Single source: 도토리's FORBIDDEN 11 Perfect Dive of 黒沢ダイスケ feat. 濱田道子's Things I Treasure (uploaded 2026-09-18) — the catalog's FBD 11 chart from Arc 2.5: Every Moment, played at SPEED 5.00 on the default Shift / A S D F / Space key layout.
  • ▸The run is a Perfect Dive — NEAR 0, BREAK 0, all 1,121 judgements EXACT (1,108 + 13) — which subsumes any full-combo claim. The score settles at 100'001'108 with rank EX+ and MAX LINK 1121 chaining the whole chart.
  • ▸It is a personal best, not a first score: the detail screen already read HIGH SCORE 099'956'508 before the dive, and DIFFERENCE posts +000'044'600 — arithmetic, not interpretation.
  • ▸The catalog publishes no FBD note split for this song, so the card's 1,121 is the capture's own FBD total; the ULT split (713 notes) belongs to the sister page's chart. Same song, two difficulties, two pages.

Source footage

Everything on this page is read from one capture: 도토리's [In Falsus] Things I Treasure (FBD 11) PERFECT DIVE (MAX-13), a 2:40 1080p60 upload posted on 2026-09-18. It opens on the song detail screen and plays the dive start to finish, result card included.

Watch on YouTube (도토리) ↗

The upload's auto captions carry only the song's own vocals — lyric fragments like "You can call me anything" and "Heat" — no narration, so every fact on this page is screen forensics cross-checked against the song catalog. Overlay disclosure: there is none to make — the capture carries no camera, no channel watermark, no burned-in text and no live badge anywhere (checked across the contact sheets and every delivered still); the only text on screen is game UI. The video itself is untouched and linked in full. This is the song's FBD-side anchor: the ULT 9 sister page covers the lower chart's sightread and first clear.

The chart at a glance

Catalog data and what the capture shows

Levels and arc come straight from the site's song catalog (game version 1.0.2c). The anchor here is FBD 11 — the detail screen spells the axis DIFFICULTY FORBIDDEN, quoted as seen — played at SPEED 5.00.

SongThings I Treasure
Artist黒沢ダイスケ feat. 濱田道子
ArcArc 2.5: Every Moment
Game version1.0.2c
Levels (MIN · EVO · ULT · FBD)MIN 2 · EVO 5 · ULT 9 · FBD 11

The catalog publishes a per-difficulty note split only for ULT — there is no FBD, MIN or EVO split for this song. The ULT row below is the sister page's chart; the capture's own card puts the FBD total at 1,121 (EXACT 1,108 + 13, NEAR 0, BREAK 0 — matching its MAX LINK 1121), which stands on the capture alone.

Diff.TapHoldFieldFlickTotal
ULT184193197139713

→ In Falsus Song List — All 75 Tracks with Chart Levels→ Difficulty Levels

How the dive unfolds

Twelve frames from the detail screen to the EX+ card

Every step links back to the exact second of the source video. The on-screen score counter grounds each frame; the capture plays clean — nothing needed patching out.

  1. 1

    Read the detail screen before you dive

    The song detail screen hangs a red 11 beside DIFFICULTY FORBIDDEN — the game's own spelling of the FBD axis — with HIGH SCORE already at 099'956'508 and FREEPLAY on the right. The shattered-glass jacket credits 黒沢ダイスケ feat. 濱田道子. That high score matters later: this run beats it.

    In Falsus Things I Treasure FBD song detail screen with a red 11 badge beside DIFFICULTY FORBIDDEN and HIGH SCORE 099'956'508 over the shattered-glass jacket art
    HIGH SCORE already reads 099'956'508 — the dive is chasing a personal best, not a first score. · 도토리 ↗
  2. 2

    The dive stages at SPEED 5.00

    The dive intro holds SCORE 000'000'000 over an empty highway. The in-play song panel reads Things I Treasure over an FBD 11 chip and SPEED 5.00, and the lane keys are the default English layout — Shift on the left rail, A S D F across the board, Space on the right rail.

    In Falsus Things I Treasure FBD dive staged on an empty highway with SCORE 000'000'000 and the in-play song panel showing the FBD 11 chip and SPEED 5.00
    Lane keys read Shift, A, S, D, F and Space — the default keyboard layout, quoted as seen. · 도토리 ↗
  3. 3

    The opening flick row lands four EXACTs

    The chart opens with a gold flick wedge sweeping the left lanes while a four-wide EXACT row posts across the judgement line at 003'013'131 — a first hint that FBD 11 keeps both hands busy from the first second.

    In Falsus Things I Treasure FBD 11 opening with a gold flick wedge on the left lanes and four EXACT tags across the judgement line at score 003'013'131
    Combo 34 at the moment of the frame — flicks and taps alternate without a gap from the first bar. · 도토리 ↗
  4. 4

    The violet L-hold tests your grip

    Around combo 98 a violet hold ribbon enters from the top center, kinks into an L and rides down onto the S and D lanes at 008'718'662 — hold the kinked geometry steady while taps keep landing beside it.

    In Falsus Things I Treasure FBD 11 violet L-shaped hold ribbon bending onto the S and D lanes at score 008'718'662 with an EXACT pair on the judgement line
    The hold's corner is the trap: release timing judges at the tail, not the bend. · 도토리 ↗
  5. 5

    A wide cyan panel covers the board

    The mid-game opens up: a translucent cyan field panel sweeps the full A–F width at 023'946'625 while a violet beam overlaps it from the right — the chart's first full-board moment.

    In Falsus Things I Treasure FBD 11 wide translucent cyan field panel spanning the A to F lanes with a violet beam crossing it at score 023'946'625
    Field cells tick underneath while the beam's EXACT pair posts on top of the panel. · 도토리 ↗
  6. 6

    Violet and cyan slabs cross

    At 039'328'486 a violet slab and a cyan slab cross diagonally over the A and S lanes, EXACT pair at the line — and the crossing geometry repeats tighter as the song climbs.

    In Falsus Things I Treasure FBD 11 violet slab crossing a cyan slab diagonally over the left lanes at score 039'328'486 with EXACT tags on the judgement line
    Combo watermark 441 rides the highway behind the crossing. · 도토리 ↗
  7. 7

    The curved sail over the cyan panel

    The chart's signature shape: a violet sail-panel curves down over a cyan field slab at 052'800'065, both judged at the same instant — one motion, two EXACTs.

    In Falsus Things I Treasure FBD 11 curved violet sail slab over a cyan field panel with an EXACT pair posting at score 052'800'065
    The sail's curve slides the judgement window — flick at the tail, not at the crest. · 도토리 ↗
  8. 8

    The S-curved hold into the beam

    A violet hold snakes down in an S-curve and hands off into a cyan beam at 062'612'898 — the longest single-motion ask of the chart, landing mid-song where fatigue bites.

    In Falsus Things I Treasure FBD 11 S-curved violet hold ribbon handing off into a cyan beam at score 062'612'898 with EXACT EXACT on the judgement line
    Combo watermark 701 — still unbroken at the handoff. · 도토리 ↗
  9. 9

    Gold flicks and sparkle bursts

    The late game turns gold: flick arrows interleave with cyan slabs and gold sparkle bursts at 082'507'167, combo 925. The density peaks here — and the card ends without a single NEAR.

    In Falsus Things I Treasure FBD 11 late chart with a gold flick arrow between cyan slabs and a gold sparkle burst at score 082'507'167 and combo 925
    The EXACT tag rides the F-lane burst — flicks judge on the same line as taps. · 도토리 ↗
  10. 10

    Twin side walls close the song

    The finale lines both rails: a violet wall on Shift and a pink wall on Space, each posting EXACT at 097'751'100, combo 1096. The last notes empty the highway at 100'001'108 with the chart total 1121 watermarked across the lanes.

    In Falsus Things I Treasure FBD 11 finale with a violet wall on the Shift rail and a pink wall on the Space rail at score 097'751'100 and combo 1096
    Both walls judge EXACT at the same instant — the run's last judgement. · 도토리 ↗
  11. 11

    The PERFECT DIVE banner

    With NEAR 0 and BREAK 0 locked in, the hexagonal PERFECT DIVE banner takes the screen — the game's above-full-combo mark, the same tier as the channel's init() run.

    In Falsus Things I Treasure FBD 11 PERFECT DIVE banner in glowing pink lettering over the hexagonal overlay after the final note
    NEAR 0, BREAK 0 — every one of the 1,121 judgements EXACT. · 도토리 ↗
  12. 12

    The result card: EX+ at 100'001'108

    The DIVE RESULT card settles: SCORE 100'001'108 with rank EX+, MAX LINK 1121, HIGH SCORE 099'956'508, DIFFERENCE +000'044'600, and four judgement rows — EXACT 1108 + 13, NEAR 0, BREAK 0 — summing to 1,121. The IOTA panel reads ENCOUNTER UNLINKED, and no MISS GAUGE row appears.

    In Falsus Things I Treasure FBD 11 DIVE RESULT card showing SCORE 100'001'108 with rank EX+, MAX LINK 1121, EXACT 1108 + 13, NEAR 0, BREAK 0 and the PERFECT DIVE strip
    100'001'108 − 099'956'508 = +000'044'600: a personal best by 44,600, arithmetic as shown. · 도토리 ↗

→ Hardest Songs

FAQ

The questions this page actually answers

How does the FBD 11 chart compare with the ULT 9 chart?

The catalog lists Things I Treasure at MIN 2, EVO 5, ULT 9 and FBD 11. The sister page's ULT 9 sightread clears with 11 BREAKs across 713 notes; this FBD 11 card reads 1,121 judgements — a far denser chart — and never leaves EXACT: NEAR 0, BREAK 0.

Is this page a replacement for the Things I Treasure ULT page?

No — the two pages are deliberately two halves of one song. The ULT page anchors TrappyTheDemon's ULT 9 sightread (SPEED 7.00, rank AA, first clear); this page anchors 도토리's FBD 11 Perfect Dive (SPEED 5.00, rank EX+, personal best). Read the ULT page to learn the song, and this one to see its ceiling.

What does PERFECT DIVE mean compared with a full combo?

On the result card it means NEAR 0 and BREAK 0 — every one of the 1,121 judgements EXACT. That subsumes a full combo, so the page claims nothing beyond the card: a Perfect Dive, and a personal best.

Is 100'001'108 the song's first registered FBD score?

No. The detail screen already read HIGH SCORE 099'956'508 before the dive, and the card's DIFFERENCE posts +000'044'600 — exactly the gap to the new 100'001'108. It is a personal best by 44,600, shown as arithmetic, not a first score.

Why does the notes table show only ULT?

Because that is all the catalog publishes: a per-difficulty split exists only for ULT (184 tap + 193 hold + 197 field + 139 flick = 713). No FBD split is catalogued, so this page states the capture's own total — 1,121 judgements — and stops at the card's word.

RELATED