Song Dive · Arc 2

init() — FBD 11, Perfect Dive

KAMOME SANO · FORBIDDEN 11 · 1,469 NOTES · PERFECT DIVE

A frame-by-frame read of 도토리's FORBIDDEN 11 perfect dive of kamome sano's init() — the jacket screen, the staged highway, the holds that never let go and the gold field cells — ending in a PERFECT DIVE at 100'001'452, with the EX+ result card that proves all 1,469 judgements landed EXACT.

The run at a glance

  • ▸Single source: 도토리's FORBIDDEN 11 perfect dive of kamome sano's init() (uploaded 2026-09-14) — the catalog's FBD 11 chart from Arc 2: A Past Best Untold, played at SPEED 4.50 with keyboard lanes reading Shift, A, S, D, F and Space.
  • ▸The cross-check lands exactly: the result card's four rows — EXACT 1452 + 17, NEAR 0, BREAK 0 — sum to 1,469, matching the catalog's FBD note split (tap 221 + hold 463 + field 626 + flick 159) judgement for judgement.
  • ▸A perfect dive, and a personal best by twelve points: HIGH SCORE already read 100'001'440 on the detail screen before the dive, and DIFFERENCE carries +000'000'012 — 100'001'452 = 100'001'440 + 12, read as arithmetic, not interpreted.
  • ▸Density is the story: field notes are 626 of 1,469 and holds another 463 — together roughly three quarters of the chart — so the highway spends most of the dive bent into ribbons and lit gold at the judgement line.

Source footage

One video backs every still below: 도토리's In Falsus perfect dive of init() on FORBIDDEN 11 (2:51, uploaded September 14, 2026). Deep links in each step jump to the matching moment.

Watch on YouTube ↗

The upload has a caption track, but it carries only stray lyric fragments picked up from the song — no narration — so every fact below is screen forensics cross-checked against the song catalog. The capture carries no recorder overlay of any kind — no camera, no channel watermark, no burned-in text — so the stills stand exactly as recorded; the only badges on screen (the red FBD 11 chip, the in-play song panel, the lane key labels) are game UI, quoted as seen. The video itself is untouched and linked in full. Deep-link seconds follow the decode-accurate timeline of the upload and can land a frame or two off; every still was verified individually.

The chart at a glance

CATALOG · V1.0.2C

Levels and the note split come straight from the site's song catalog (game version 1.0.2c) — the numbers the result card is checked against in step 11, to the judgement.

Songinit()
Artistkamome sano
ArcArc 2: A Past Best Untold
Version1.0.2c
Levels (MIN · EVO · ULT · FBD)MIN 2 · EVO 5 · ULT 9 · FBD 11

→ In Falsus Song List — All 75 Tracks with Chart Levels→ Difficulty Levels

How the FBD 11 chart unfolds — all 1,469 notes of it

11 FRAMES · 2:51 CAPTURE

One step per frame, in play order. Seconds in each credit link follow the decode-accurate timeline of the upload and can land a frame or two off.

  1. 1

    Confirm the chart: FORBIDDEN 11

    The detail screen states the terms: a red 11 beside DIFFICULTY FORBIDDEN — the game's own spelling of the FBD axis, quoted as seen — with HIGH SCORE already at 100'001'440, the jacket crediting kamome sano with ILLUST もあち, and FREEPLAY on the right. That high score matters later: this dive starts from a mark, not from zero.

    In Falsus init() song detail screen showing DIFFICULTY FORBIDDEN 11 with HIGH SCORE 100'001'440 on file and the kamome sano jacket above the FREEPLAY button
    Level 11 on the game's FORBIDDEN axis, with a high score already on file · 도토리 ↗
  2. 2

    Stage the dive at 000'000'000

    The highway opens empty with the score at 000'000'000 and the in-play song panel reading init() / kamome sano over an FBD 11 chip and SPEED 4.50. The lane keys read Shift on the left wing, A S D F down the middle and Space on the right — a keyboard dive, quoted as seen. No Assist Mode slot appears anywhere in the capture.

    In Falsus init() FBD 11 dive staged on an empty highway at SCORE 000'000'000 with the Shift, A, S, D, F and Space lane keys lit and the in-play song panel reading SPEED 4.50
    000'000'000 — keyboard lanes Shift / A S D F / Space, SPEED 4.50 · 도토리 ↗
  3. 3

    Open under the first hold ribbon

    The first pattern arrives already holding: a wide violet ribbon sweeps the left lanes with the combo counter on 18 and an EXACT pair posting at the line, the HUD at 001'221'091. A chart whose two biggest buckets are field (626) and holds (463) does not ease in — it grabs immediately.

    In Falsus init() FBD 11 chart opening with a wide violet hold ribbon across the left lanes and an EXACT pair posting at combo 18, HUD at 001'221'091
    001'221'091 — the chart grabs with a hold from note one · 도토리 ↗
  4. 4

    Split the beams, catch the gold wedge

    A violet beam and a cyan beam stack two lanes while a gold hexagon wedge flares at the bottom edge, judged EXACT twice with the HUD at 018'228'768 and the combo on 268. Flicks are the chart's smallest share — 159 of 1,469 — but the field cells they ride announce themselves in gold exactly like this.

    In Falsus init() FBD 11 violet and cyan beams stacked over a gold hexagon wedge flaring at the bottom edge, judged EXACT twice with the HUD at 018'228'768
    018'228'768, combo 268 — the field cells light gold under the beams · 도토리 ↗
  5. 5

    Bend under the curved panel

    A translucent violet panel arcs across the right half of the highway while the gold field cells light the S, D and F lanes at the judgement line, judged EXACT twice with the HUD at 030'694'448 and the combo on 451. The panel geometry bends because the notes underneath do — this chart rarely draws a straight line for long.

    In Falsus init() FBD 11 translucent violet panel arcing across the right half of the highway while gold field cells light the S, D and F lanes at 030'694'448
    030'694'448, combo 451 — the panel bends because the notes do · 도토리 ↗
  6. 6

    Take the cyan slab wall

    A cyan slab runs nearly the full height of the right side while a yellow hexagon cell waits on D, judged EXACT with the HUD at 040'317'185 and the combo on 593. Past the 40-percent mark, the field's 626 notes have already made the bottom edge a permanent light show.

    In Falsus init() FBD 11 cyan slab wall running the right side of the highway with a yellow hexagon field cell waiting on the D lane, HUD at 040'317'185
    040'317'185, combo 593 — past the 40-percent mark · 도토리 ↗
  7. 7

    Ride the S-curved hold

    The chart's signature shape: one violet hold ribbon sweeps an S-curve from the centre lane down to the right, posting EXACT three times across the line with the HUD at 050'214'949 and the combo on 738. The 463 holds spend themselves in bends like this — never straight down, always moving under your fingers.

    In Falsus init() FBD 11 violet hold ribbon sweeping an S-curve from the centre lane to the right with three EXACT judgements posting, HUD at 050'214'949
    050'214'949, combo 738 — the chart's signature bend · 도토리 ↗
  8. 8

    Cross the full diagonal

    A violet beam enters at the top centre and crosses the whole highway to exit at the bottom left, judged EXACT twice with the HUD at 059'536'791 and the combo on 875. It is the widest single line the chart draws, and it still ends in an EXACT — every one of this dive's 1,469 judgements will.

    In Falsus init() FBD 11 violet beam crossing the full highway diagonally from top centre to the bottom left lane, judged EXACT twice at 059'536'791
    059'536'791, combo 875 — the widest single line in the chart · 도토리 ↗
  9. 9

    Absorb the last note: 1469

    The highway empties and the chart posts its own total — 1469, watermarked across the lanes — as the final note lands with the HUD at 100'001'312. The count on screen matches the catalog's FBD split to the note: 221 + 463 + 626 + 159.

    In Falsus init() FBD 11 emptied highway with the total note count 1469 watermarked across the lanes as the final note lands with the HUD at 100'001'312
    100'001'312 — the chart posts its own total: 221 + 463 + 626 + 159 · 도토리 ↗
  10. 10

    PERFECT DIVE

    The banner takes the screen over the emptied highway — the game's verdict for a dive with nothing below EXACT. NEAR 0 and BREAK 0 are still a second away from being confirmed on the card, but the banner only appears when they are both zero.

    In Falsus PERFECT DIVE banner over the emptied highway after the init() FBD 11 dive lands all 1,469 notes as EXACT
    Nothing below EXACT — the game's top verdict on a dive · 도토리 ↗
  11. 11

    Read the result card

    The card settles: SCORE 100'001'452 with rank EX+ beside it, MAX LINK 1469 chaining the whole chart, and the four rows — EXACT 1452 + 17, NEAR 0, BREAK 0 — summing to 1,469, the catalog's FBD split exactly. HIGH SCORE read 100'001'440 before the dive and DIFFERENCE carries +000'000'012: a personal best by twelve points, read as arithmetic, not interpreted. The IOTA strip reads ENCOUNTER UNLINKED, and no MISS GAUGE row appears — a perfect dive has no misses to gauge.

    In Falsus init() FBD 11 result card with SCORE 100'001'452 at rank EX+, MAX LINK 1469, EXACT 1452 + 17, NEAR 0, BREAK 0 and DIFFERENCE +000'000'012 over the pre-existing HIGH SCORE 100'001'440
    EX+ at 100'001'452 — a personal best by twelve points · 도토리 ↗

→ Hardest Songs

Frequently asked questions

init() · FBD 11

How hard is init() on FBD 11 in In Falsus?

The catalog lists MIN 2, EVO 5, ULT 9 and FBD 11, and splits the FBD 11 chart into tap 221, hold 463, field 626 and flick 159 — 1,469 notes, among the densest charts on the game's top difficulty axis. The grind is structural: field and holds together are roughly three quarters of the chart, so endurance matters as much as any single pattern. This capture clears it without a single NEAR or BREAK.

What does the result card show for this run?

SCORE 100'001'452 with rank EX+, MAX LINK 1469, HIGH SCORE 100'001'440, DIFFERENCE +000'000'012, and four judgement rows — EXACT 1452 + 17, NEAR 0, BREAK 0 — that sum to 1,469, matching the catalog's FBD note split exactly. The card carries a PERFECT DIVE banner, the IOTA strip reads ENCOUNTER UNLINKED, and no MISS GAUGE row appears anywhere on the card.

Is this a first clear or a personal best?

A personal best, and this page claims nothing more. The detail screen already read HIGH SCORE 100'001'440 before the dive, and the card's DIFFERENCE shows +000'000'012 — 100'001'452 minus 100'001'440, read as arithmetic. A first registered score would show a dash for HIGH SCORE and DIFFERENCE carrying the full amount; neither is the case here.

How does FBD 11 compare with the song's other difficulties?

The catalog lists MIN 2, EVO 5, ULT 9 and FBD 11. The ULT 9 chart is no pushover at 1,273 notes (tap 184 + hold 280 + field 632 + flick 177), but FBD 11 adds 196 more notes and sharpens the hold work — 463 holds to ULT's 280. init() is kamome sano's entry in Arc 2: A Past Best Untold of the full release (game version 1.0.2c); the catalog also notes the song appears in Arcaea.

RELATED