Song Dive · Virtual Singers

Monitoring — ULT 8 FULL LINK, EX+

DECO*27 · ULT 8 · FULL LINK · MAX LINK 634

A frame-by-frame read of Coconut Gator's ULT 8 run of DECO*27's Monitoring — 634 judgements, the exact total the catalog publishes for the axis — ending in a FULL LINK banner, rank EX+ at 099'921'732, and a +000'709'800 personal best that checks to the digit.

In Falsus Monitoring ULT 8 result card: FULL LINK, rank EX+, 099'921'732, MAX LINK 634 and EXACT 596 + 37
EX+, FULL LINK, 634 of 634 — a +000'709'800 personal best · Coconut Gator ↗

The run at a glance

  • ▸Single source: Coconut Gator's Monitoring ULT 8 run (2:52 capture, uploaded on the Virtual Singers DLC's release day, 19 views as of the 2026-10-03 page build). The in-play panel states the terms — Monitoring, DECO*27, an 8 badge beside SPEED 3.50 — and the catalog agrees (MIN 1 / EVO 4 / ULT 8 / FBD 11).
  • ▸The card's four rows — EXACT 596 + 37, NEAR 1, BREAK 0 — sum to 634, and the catalog publishes exactly that total for Monitoring's ULT 8: card total, MAX LINK 634 and the published total agree three ways.
  • ▸A FULL LINK in name and numbers: the FULL LINK banner crosses the darkened highway and the CONNECTED banner follows at the frozen HUD, the chain watermark's final 634 means every link stayed unbroken, and the run's only non-EXACT was one NEAR (EARLY 0 / LATE 1). The rank is EX+ at SCORE 099'921'732.
  • ▸Not a first score — a personal best: HIGH SCORE 099'211'932 was already on file (it sits on the standby screen before the dive), and the card's DIFFERENCE +000'709'800 checks exactly (099'921'732 − 099'211'932). ENCOUNTER RESULT posts 000'688'202 with a CONNECTED chip over five stars.

Source footage

One video backs every still below: Coconut Gator's In Falsus run of Monitoring on ULT 8 (2:52, a CONNECT match of AYAME vs LYNN). Deep links in each step jump to the matching moment.

Watch on YouTube ↗

The capture is completely clean — no camera face, no hand-cam, no channel watermark, no burned-in captions anywhere in the 171.4s (checked cell by cell on a contact sheet and again at full resolution on eight frames across the run), so all twelve delivered stills are unpatched, and the video itself is untouched and embedded in full. The upload's only caption track is auto-generated text of the song vocals — no narration — so every fact on this page is screen forensics cross-checked against the song catalog, and the run's numbers are that player's result on their own account, not an official baseline. Deep-link seconds follow the verified timeline of the download — the container reports no frame count and one filter pass drifted about ten seconds mid-video, so every still was checked individually against its own on-screen score counter — and can land a moment off on YouTube's player.

The chart at a glance

CATALOG · V1.0.5

Levels come straight from the site's song catalog (game version 1.0.5). Monitoring is a Virtual Singers pack entry — DECO*27's モニタリング — and ULT 8 is the axis this capture plays; the standby screen labels it DIFFICULTY ULTIMATE with the same 8 badge.

SongMonitoring
ArtistDECO*27
PackVirtual Singers
Version1.0.5
Levels (MIN · EVO · ULT · FBD)MIN 1 · EVO 4 · ULT 8 · FBD 11

The catalog publishes totals only for the Virtual Singers pack — no tap/hold/field/flick split on file, and none is invented. The ULT total is the same 634 the result card's judgement rows sum to, so the card still reconciles against published data.

DifficultyTotal
MIN322
EVO450
ULT634
FBD1359

→ Roki FBD 13 guide→ Song List→ Difficulty Levels

How the ULT 8 chart unfolds — and where it lands

11 STEPS · 2:52 CAPTURE

One step per frame, in play order, after the settled result card up top. Seconds in each credit link follow the verified timeline of the upload and can land a frame or two off.

  1. 1

    The standby screen

    The capture opens on Monitoring's standby screen: the モニタリング jacket (ILLUST VIBU) under a DIFFICULTY ULTIMATE chip with the 8 badge, HIGH SCORE 099'211'932 already on file, and the CONNECT rail on the right staging the opposing side — Severed, HIGH SCORE 000'448'845 with a CONNECTED chip and ⚡40,000 / ❄68,400 thresholds.

    In Falsus Monitoring standby screen: DECO*27 jacket, ULTIMATE 8 badge and HIGH SCORE 099'211'932 before the dive
    ULTIMATE 8, score already on file, CONNECT rail staged · Coconut Gator ↗
  2. 2

    The CONNECT loadout splash

    The CONNECT splash pairs the divers: AYAME left, LYNN right, with the five-card loadout between them quoted as displayed — True Colors ⚡25,759/❄25,759, Searching Shadows ⚡12,255/❄61,271, Graduation ⚡47,811/❄47,811, The Price of Self-Worth ⚡17,032/❄31,631 and Anguish and Hate ⚡18,280/❄21,092 — both gauges staged at 100.00% and the score at 000'000'000.

    CONNECT splash pairing AYAME with LYNN over the five-card loadout in In Falsus Monitoring ULT 8
    AYAME ↔ LYNN, five cards quoted as displayed · Coconut Gator ↗
  3. 3

    Stage the dive: ULT 8 at SPEED 3.50

    The empty highway at 000'000'000. The top-right panel states the terms: Monitoring, DECO*27, the 8 badge beside SPEED 3.50. ENCOUNTER SCORE sits at 0 over an empty star rail, the diver's side reads ⚡190,319 / ❄297,020 at 100.00% (297K/297K) against ❄68,400 / ⚡40,000 opposite, and both edges show PHASE 0.

    Monitoring ULT 8 staged at 000'000'000 on the empty In Falsus highway: SPEED 3.50, PHASE 0 and an empty star rail
    000'000'000 — the 8 badge beside SPEED 3.50 · Coconut Gator ↗
  4. 4

    First judgements on the opening beam

    The opening curved beam crosses with an EXACT posting on the judgement line, the HUD ticking to 001'000'505 with ENCOUNTER SCORE 5,926. The diver's side has charged to ⚡241,705 / ❄534,636 (99.99%, 297K/297K), the opposing gauge reads 94.03% (^64,317/68,400), and the left edge flips to PHASE 1.

    First EXACT posting on the opening curved beam in In Falsus Monitoring ULT 8 at 001'000'505, PHASE 1
    001'000'505 — ENCOUNTER SCORE 5,926 · Coconut Gator ↗
  5. 5

    The green cross spark at watermark 58

    The chart's first signature hit: a green cross spark bursts on the right lanes beside an EXACT EXACT EXACT row, the chain watermark at 58, the HUD at 009'060'699 with ENCOUNTER SCORE 49,100 and three stars lit. ULT 8's opening third is still a warm-up.

    Green cross spark bursting beside an EXACT row at chain watermark 58 in In Falsus Monitoring ULT 8
    009'060'699 — three EXACTs, watermark 58 · Coconut Gator ↗
  6. 6

    PHASE 2 — the four-lane cyan fan

    A four-lane cyan hold fans across the centre lanes as an EXACT posts, the chain watermark at 159, the HUD at 025'077'600 with ENCOUNTER SCORE 76,699 and four stars lit, PHASE 2 on the edges — and the opposing gauge driven to −124.25% (−85,007/68,400), quoted as displayed.

    Four-lane cyan hold fanning across the centre at watermark 159 in In Falsus Monitoring ULT 8, PHASE 2
    025'077'600 — PHASE 2, opposing gauge −124.25% · Coconut Gator ↗
  7. 7

    The S-curve beam

    The verse's set piece: a full-length violet beam sweeps an S-curve down the highway with a single EXACT posting on its face and gold pad bursts firing under the Shift edge. The HUD reads 040'532'937 with ENCOUNTER SCORE 147,276, PHASE 3 on both edges, and the opposing rail at −297.37% (−203K/68,400).

    Full-length violet beam sweeping an S-curve in In Falsus Monitoring ULT 8 at 040'532'937, PHASE 3
    040'532'937 — ENCOUNTER SCORE 147,276 · Coconut Gator ↗
  8. 8

    PHASE 4 — the full-width wall

    The mid-game signature: a full-width violet wall rises over every lane as a green cross spark bursts beside an EXACT EXACT row, the chain watermark at 397, the HUD at 062'544'467 with ENCOUNTER SCORE 359,216 and all five stars lit, PHASE 4 on the edges, and the opposing gauge at −583.69% (−388K/68,400).

    Full-width violet wall rising over every lane at watermark 397 in In Falsus Monitoring ULT 8, PHASE 4
    062'544'467 — five stars, opposing gauge −583.69% · Coconut Gator ↗
  9. 9

    PHASE 5 — the white laser column

    PHASE 5 opens the endgame: twin EXACTs post over a white laser column with gold pad bursts along the bottom edge, the chain watermark at 519, the HUD at 081'671'570 with ENCOUNTER SCORE 522,840, and the opposing gauge driven to −887.16% (−470K/68,400), quoted as displayed.

    Twin EXACTs over a white laser column opening PHASE 5 in In Falsus Monitoring ULT 8 at 081'671'570
    081'671'570 — watermark 519, gauge −887.16% · Coconut Gator ↗
  10. 10

    FULL LINK

    The 634th link lands and the banner takes the screen: FULL LINK, over the darkened highway — the chain never broke across the whole chart. The dimmed HUD behind it carries the final 099'921'732, and a CONNECTED banner follows across the empty lanes before the card loads.

    The FULL LINK banner crossing the darkened highway after the 634th link lands in In Falsus Monitoring ULT 8
    634 links, none dropped · Coconut Gator ↗
  11. 11

    CONNECTED, then the card

    The CONNECTED banner crosses the empty lanes under the watermark's final 634 at the frozen HUD — score 099'921'732, ENCOUNTER SCORE 688,202 with five stars lit, an x5.0 multiplier chip on the left rail, and the opposing side at −809.21%. The DIVE RESULT settles next: SCORE 099'921'732 with an EX+ rank tile beside the judgement rows, MAX LINK 634, HIGH SCORE 099'211'932, DIFFERENCE +000'709'800 — arithmetic checks: 099'921'732 − 099'211'932 = 709'800, a personal best, not a first score. The four rows — EXACT 596 + 37, NEAR 1, BREAK 0 — sum to 634, matching MAX LINK and the catalog's ULT total exactly; an EARLY 0 / LATE 1 panel sits beside the rows. The IOTA strip quotes cells 941 x3, 635 x8, 596 x2, 875 x7, 997 x1 and 740 x4 — a seventh (767) cut by the strip's arrow, not quoted — the diver's bar reads AYAME at 86.79%, and ENCOUNTER RESULT posts 000'688'202 with a CONNECTED chip over five stars.

    CONNECTED banner under the final watermark 634 at the frozen 099'921'732 HUD in In Falsus Monitoring ULT 8
    634 — ENCOUNTER SCORE 688,202, five stars · Coconut Gator ↗

→ Hardest Songs

Frequently asked questions

MONITORING · ULT 8

How hard is Monitoring on ULT 8 in In Falsus?

On paper Monitoring lists MIN 1, EVO 4, ULT 8 and FBD 11 — ULT 8 sits three steps under the FBD 11 top axis, with totals of 322 / 450 / 634 / 1,359 notes. This capture full-links the ULT 8 chart at SPEED 3.50: 633 of 634 judgements EXACT (596 + 37 across the card's two EXACT rows), one NEAR, no BREAK, MAX LINK 634, rank EX+.

What does the result card show for this run?

SCORE 099'921'732 with an EX+ rank tile, MAX LINK 634, HIGH SCORE 099'211'932, DIFFERENCE +000'709'800, and four judgement rows — EXACT 596 + 37, NEAR 1, BREAK 0 — summing to 634. A FULL LINK banner under the rows, an EARLY 0 / LATE 1 panel beside them, an IOTA strip reading 941 x3 through 740 x4, and ENCOUNTER RESULT 000'688'202 with a CONNECTED chip over five stars.

Is this a first clear of the chart?

No — HIGH SCORE 099'211'932 was already on file, and the standby screen shows it before the dive. DIFFERENCE +000'709'800 is exactly 099'921'732 − 099'211'932, so this run is a personal best. It is also one player's result on their own account, not an official baseline; the opposing CONNECT rail (Severed / LYNN) carries its own HIGH SCORE 000'448'845.

Why does the 634 total matter on this page?

Because the catalog publishes a ULT note total for Monitoring — 634, totals only for the Virtual Singers pack with no tap/hold/field/flick split on file — and it is the exact axis this capture plays. The card's judgement rows sum to 634 (596 + 37 + 1 + 0), MAX LINK reads 634, and the final chain watermark on the highway reads 634: a three-way match between play, card and catalog.

How do I unlock Monitoring in In Falsus?

Monitoring ships with the paid Virtual Singers song pack (game version 1.0.5). Beyond that, no unlock steps are documented — not on screen in this capture, and not in the site's catalog data — so this page leaves the flow blank rather than invent one. The song-select standby screen shows no unlock condition, and no pack quest chain appears anywhere in the capture.

What is CONNECT — who are AYAME and LYNN?

The capture runs as a CONNECT encounter: the splash pairs the captured diver AYAME with LYNN, each side staging a five-card loadout. In play an ENCOUNTER SCORE counter runs under the score with a five-star rail lighting as thresholds pass, the opposing gauge posts deep negative percentages at the quoted moments, and it settles as ENCOUNTER RESULT 000'688'202 with a CONNECTED chip. Everything above is quoted as displayed — no mode rules beyond that are claimed.

RELATED