Song Dive · Virtual Singers
Lost One's Weeping — ULT 8, the chart viewed
NERU · ULTIMATE 8 · CHART VIEW · 731 NOTES
A section-by-section read of Neru's Lost One's Weeping on the ULTIMATE 8 axis, built from Outoki's in-game chart view: where the full-lane holds run, which walls slam four lanes in one stroke, and what the autoplay's closing card says — and doesn't.
The preview at a glance
- ▸Single source: Outoki's Lost One's Weeping (Ultimate 8) Chart View (2:34, uploaded September 30, 2026 — the Virtual Singers DLC release day — 1080p60, 9 views as of the 2026-10-04 page build) — the game's automatic preview, not a player. The in-play panel states the terms — Lost One's Weeping, Neru, an ULT 8 chip beside SPEED 3.50 — and the menu card backs it with DIFFICULTY ULTIMATE 8.
- ▸The catalog and the card agree: MIN 2 / EVO 5 / ULT 8 / FBD 11, with exactly 731 notes on the ULT axis (380 / 473 / 731 / 1,411 across the four). The card's rows — EXACT 76 + 0, NEAR 0, BREAK 655 — sum to 731 to the digit.
- ▸The shape of the chart: a full-lane cyan hold opens under BREAK markers, gold flick fans spread wide across the lanes, a violet pane slams four lanes in a single stroke, a cyan hold and a violet pane rake the line side by side, and a travelling hold draws a full S-curve through the endgame.
- ▸The ending card is quoted as displayed: DIVE FAILED, rank D, 010'396'793, MAX LINK 5, MISS GAUGE -15 beside a blank HIGH SCORE slot — its rows sum to exactly the catalog's 731. No player played this chart; the page claims no clear, rank or score.
Source footage
One video backs every still below: Outoki's Lost One's Weeping ULT 8 Chart View (2:34, uploaded September 30, 2026, 1080p60). Deep links in each step jump to the matching moment.
Scope disclosure: this is an autoplay chart preview, so nothing on the page is a human clear, score or rank claim — the closing DIVE FAILED card belongs to the preview itself and is quoted as displayed. No human ULT capture of this song is on the record yet, so the page is a chart-reading guide, not a run report. The capture is completely clean — no hand-cam, no face cam, no channel watermark, no burned-in captions across every frame checked — so all thirteen stills are unpatched, and the video itself is untouched and embedded in full; its only subtitles are YouTube's auto-generated lyric transcription, which was read in full and relied on for nothing. Every still was cut with an output-side seek on the cached 1080p60 download and verified against its own on-screen score counter; deep-link seconds follow the container timeline of the download. One quirk is quoted as seen: the counter reaches its final 010'396'793 with roughly half a minute of chart still to scroll, and the screen does not document why.
The chart at a glance
CATALOG · V1.0.5Levels and note counts come straight from the site's song catalog (game version 1.0.5). Lost One's Weeping is a Neru entry in the Virtual Singers pack, and ULT 8 — the axis this capture plays — sits three steps below the song's own FBD 11.
| Song | Lost One's Weeping |
|---|---|
| Artist | Neru |
| Pack | Virtual Singers |
| Version | 1.0.5 |
| Levels (MIN · EVO · ULT · FBD) | MIN 2 · EVO 5 · ULT 8 · FBD 11 |
The catalog publishes totals per axis — MIN 380, EVO 473, ULT 731 and FBD 1,411 — with no tap/hold split on file for DLC songs, so the table shows exactly one column and invents nothing. The ULT total is the same number the autoplay card's rows sum to (see the last step).
| Difficulty | Notes (total) |
|---|---|
| MIN | 380 |
| EVO | 473 |
| ULT | 731 |
| FBD | 1411 |
How the ULT 8 chart unfolds — and where it stacks
13 FRAMES · 2:34 CHART VIEWOne step per frame, in play order. Deep-link seconds follow the upload's container timeline and can land a moment off; each caption quotes the frame's own counter exactly as displayed.
- 1
The menu card: Lost One's Weeping, ULTIMATE 8
The upload opens where every dive starts: the freeplay card — Lost One's Weeping, Neru, a violet 8 beside DIFFICULTY ULTIMATE, and a HIGH SCORE slot reading a dash. Nothing is on file yet, which is exactly what the closing card's DIFFERENCE will confirm. FREEPLAY sits beside the ロストワンの号哭 jacket art.

ULTIMATE 8 · no score on file yet · Outoki ↗ - 2
Not a player: the chart view stages
A one-frame loading grid, then the highway stages empty at 000'000'000. The top-right panel states the terms: Lost One's Weeping, Neru, an ULT 8 chip beside SPEED 3.50 — the game's own staging, quoted as shown.

000'000'000 — ULT 8 at SPEED 3.50 · Outoki ↗ - 3
A full-lane hold opens under BREAK markers
The first thing ULT 8 does is favour length over speed: a cyan hold rolls the full visible length of the highway toward the line under doubled BREAK labels while the counter still reads 000'000'000, a gold fan already waiting upfield — the judgements post as the tail crosses.

000'000'000 — length before speed · Outoki ↗ - 4
Gold flick fans spread across the lanes
Still at 000'000'000, a gold fan-shaped flick note spreads wide across the left lanes right at the judgement line, a BREAK label riding beside it — the chart's first widescreen ask, landing before the score has moved at all.

000'000'000 — widescreen before the first point · Outoki ↗ - 5
The score's first tick lands mid-hold
The counter finally moves — 000'136'800 — while a full-lane cyan hold is still crossing under doubled BREAK labels and the gold fan waits at the horizon. The opening trades speed for length and posts its proof late; reading the counter, not the traffic, is what dates each moment here.

000'136'800 — proof posted mid-hold · Outoki ↗ - 6
A violet hold wears fan bookends
At 000'673'481 a violet hold descends with a gold fan at its head and a green fan at its tail, EXACT and BREAK posting at the line. Hold and flicks layered into one travelling object — the chart's signature pairing, and the first shape that asks both hands to divide the work.

000'673'481 — hold and flicks as one object · Outoki ↗ - 7
The violet pane slams four lanes
At 002'839'270 a wide violet pane drops across the centre in a single stroke, BREAK EXACT BREAK posting through a storm of sparks while the gold fan rides its head. Four lanes, one read — the hardest single ask the first half makes.

002'839'270 — four lanes, one stroke · Outoki ↗ - 8
Pane and hold arrive together
At 003'556'798 a violet pane slides down the left half while a full-lane cyan hold runs the centre, BREAK marking the pane's edge. Two objects, one line, no gap between them — layering, not sequencing.

003'556'798 — two objects, one line · Outoki ↗ - 9
A hold and a pane rake the line side by side
At 004'924'797 the cyan hold and the violet pane hit the judgement line together, sparks raking the row under doubled BREAK labels. The middle third's signature texture: both hands held busy at once, neither free to help the other.

004'924'797 — both hands busy at once · Outoki ↗ - 10
The travelling hold draws a full S-curve
At 007'301'568 the violet hold bends through a complete S on its way down the centre, a green fan riding its head, EXACT BREAK EXACT EXACT posting through the sparks. The lane split moves the whole way — the chart's centrepiece, and the shape a player's hands will remember.

007'301'568 — the lane split travels · Outoki ↗ - 11
The counter hits its ceiling while notes still scroll
By 010'396'793 the counter has stopped rising — and a cyan hold crosses the line anyway, BREAK beside it, with roughly half a minute of chart still to scroll. Nothing on screen documents why the number has gone quiet; the frame is quoted as displayed and read as evidence about nothing but itself.

010'396'793 — the number goes quiet · Outoki ↗ - 12
DIVE FAILED crosses empty lanes
With the counter frozen at 010'396'793 the red DIVE FAILED banner sweeps the emptied highway, the miss gauge tag above reading -15. The banner is quoted as displayed and carries no player meaning — no one was playing.

010'396'793 — the preview's own ending · Outoki ↗ - 13
The autoplay card, quoted as displayed
The preview closes on DIVE RESULT: SCORE 010'396'793, rank D, DIVE FAILED, MAX LINK 5, MISS GAUGE -15, ENCOUNTER UNLINKED, DIFFERENCE +010'396'793 beside a blank HIGH SCORE slot, and the difficulty chip re-stamped 8 beside the jacket. The rows — EXACT 76 + 0, NEAR 0, BREAK 655 — sum to 731, the catalog's ULT total to the digit; unlike the Non-breath oblige card, this one exposes only the TOTAL column, so no further split is quoted. No one played this chart; the page claims no clear, rank or score for any player.

Rank D — 76 EXACT, 655 BREAK, 731 accounted · Outoki ↗
Frequently asked questions
LOST ONE'S WEEPING · ULTIMATE 8Is this a human playthrough of Lost One's Weeping ULT 8?
No. The source is Outoki's chart view — the game's automatic preview of the chart, uploaded September 30, 2026, the Virtual Singers DLC release day. The game plays itself, no one is on camera, and the preview ends on a DIVE FAILED card (rank D, 010'396'793). No human ULT capture of this song is on the record yet, so the page reads it as a chart preview and claims no clear, score or rank.
How many notes does Lost One's Weeping have on ULT in In Falsus?
Exactly 731 on the ULT 8 axis. The autoplay card's own rows account for every one — EXACT 76 + 0, NEAR 0, BREAK 655, summing to 731 to the digit — and the catalog publishes 380 / 473 / 731 / 1,411 across MIN, EVO, ULT and FBD.
How hard is Lost One's Weeping on ULT 8?
On paper Lost One's Weeping lists MIN 2, EVO 5, ULT 8 and FBD 11 — ULT 8 sits three steps below the song's own Forbidden cut. The axis carries 731 notes, and the chart's character is length and travel: full-lane holds, fan-bookended flicks and an S-curve hold that keeps moving, rather than raw tap speed.
Why does the autoplay end in DIVE FAILED?
As displayed: the preview posts EXACT 76 + 0, NEAR 0 and BREAK 655 — the card prints DIVE FAILED with rank D, MAX LINK 5 and MISS GAUGE -15, and every row together sums to exactly the catalog's 731. The autoplay lets notes pass unjudged until the gauge empties; why the counter goes quiet before the chart ends is not documented on screen. The card is evidence about itself only.
How do I unlock Lost One's Weeping?
The catalog files Lost One's Weeping as a Virtual Singers pack song added in version 1.0.5, and Outoki's chart views pair it with the pack's other DLC cuts. The official step-by-step unlock conditions are not documented in detail, so this page stays at the catalog facts rather than guessing a flow — the site's song-unlocks guide collects what is actually on file.
What song is this, exactly?
Lost One's Weeping by Neru — Japanese title ロストワンの号哭 — a Virtual Singers pack entry in version 1.0.5. Every fact on this page comes from the song catalog and the screen forensics of one autoplay capture.